Baobab expansion and upgrade project, Senegal
Name of the Project
Baobab expansion and upgrade project.
Location
The project is located about 145 km east of the Port of Dakar, in Senegal.
Client
Avenira.
Project Description
A 500 000 t/y nameplate-capacity processing plant was commissioned at the Baobab project in August 2016.
However, the current processing plant design is suboptimal because of the simple wet-screening technique used.
This has resulted in low product recovery and, therefore, high unit operating costs, making the existing operation financially unsustainable in the current downcycle phosphate rock price environment.
Avenira has received positive conceptual engineering study results, paving the way for a major expansion and upgrade of the Baobab processing plant.
The expanded and upgraded plant is expected to include new crushing and milling stages, flotation units, magnetic separation and drying steps, and a covered storage area.
The beneficiation process is designed to separate silica and any clays in the ore from the phosphate mineral.
The plant has been designed to process an estimated 2.4-million tonnes of feed a year with a nominal grade of 20.6% phosphorous pentoxide (P2O5) to recover about one-million tonnes of concentrate a year with an estimated grade of 35% P2O5.
The process steps include primary and secondary crushing, scrubbing, desliming, sizing, reverse flotation, magnetic separation, dewatering, drying and product storage.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
Not stated.
Value
The capital cost estimate for the expansion and upgrade of the processing plant is $53.4-million.
The processing plant capital cost estimate currently excludes any mobile equipment, mine infrastructure, site buildings or camp, site security and site communication systems.
Duration
Not stated.
Latest Developments
Avenira expects to conclude an ore reserve estimate in the fourth quarter of 2017 and an engineering and full feasibility study, as well as offtake agreements in the first quarter of 2018.
A funding and final investment decision is expected in the second quarter of 2018.
Key Contracts and Suppliers
Hatch (engineering study).
On Budget and on Time?
Not stated.
Contact Details for Project Information
Avenira, tel +61 8 9264 7000 or email frontdesk@avenira.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation