https://www.miningweekly.com

Bafokeng Rasimone Platinum Mine North Shaft Merensky Phase III project, South Africa

18th January 2019

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Bafokeng Rasimone Platinum Mine (BRPM) North Shaft Merensky Phase III project.

Location
North West, South Africa.

Project Owner/s
Royal Bafokeng Platinum.

Project Description
The project is providing further replacement for Merensky production at the North shaft complex through the extension of the existing decline system from Level 10 to Level 15 at the mine boundary.

The Merensky production levels from 11 to 15 level will give access to 1.4-million Merensky ounces (4E), using a hybrid mining method.


At steady state, Phase III will maintain the production level of the North shaft at about 100 000 t/m.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
Estimated cost at completion is forecast to be R1.165-billion against a budget of R1.4-billion, indicating a potential saving of R235-million.

Total project expenditure to date is R1.126-billion.

Planned Start /End Date
The project was completed in the final quarter of 2019.

Latest Developments
None stated.

Key Contracts and Suppliers
None stated.

Contact Details for Project Information
RBPlat executive: investor relations and corporate communications, Lindiwe Montshiwagae, tel +27 10 590 4510 or email lindiwe@bafokengplatinum.co.za.

To watch Creamer Media's latest video reports, click here
 

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Craig Miller Technical Services (CMTS)
Craig Miller Technical Services (CMTS)

CMTS is a leading, well-established EC&I contractor with 37+ years of mining and industrial experience. We execute full-scope EC&I projects with...

VISIT SHOWROOM 
ZF Aftermarket
ZF Aftermarket

ZF Aftermarket is the after-sales division of the world-renowned German ZF group, a global leader in mobility technology.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.049 1.019s - 111pq - 2rq
Subscribe Now