Azure buys project from Canada's Teck
PERTH (miningweekly.com) – Mexico-focused mineral explorer Azure Minerals has inked an agreement with the Mexican subsidiary of Canada’s Teck Resources to acquire the Alacrán copper project, in the Mexican state of Sonora.
Under the terms of the agreement, Azure would acquire full ownership of the Alacrán project by spending $5-million on exploration within the first four years of the agreement, as well as issuing 100 000 of its own shares to Teck on the signing of formal documentation, and a further 400 000 shares at the completion of the capital expenditure.
Azure would be required to spend a minimum of $2-million over the first two years, before being allowed to withdraw from the project.
Teck would retain the right to earn back a 51% interest in the project by sole-funding $10-million of expenditure, which would include a $500 000 cash reimbursement to Azure.
Furthermore, Grupo Mexico, the owner of the adjoining Cananea copper mine, would retain a 2% net smelter royalty over future mineral production from the Alacrán mine.
Azure told shareholders on Wednesday that the Alacrán property had only been lightly explored, and had the potential to host large porphyry copper deposits and smaller higher-grade deposits.
“I would describe Alacrán as the best under-explored copper project in Mexico. Located in North America’s premier copper producing district, which stretches from northern Mexico into Arizona, this is one of the world’s great copper mining provinces and the Cananea-Alacrán district is right in the middle of it,” said Azure MD Tony Rovira.
“This acquisition adds another very exciting, high-quality asset to the Azure portfolio, and will allow us to continue to progress our copper-focused exploration and development programme, while concurrently benefiting from Rio Tinto’s exploration of our Promontorio project.”
Under the terms of its agreement with Rio, the major’s subsidiary Kennecott Exploration had committed to sole-fund an initial $2-million over the next 12 months at Azure’s Promontoria copper project. The initial work would include airborne and ground geophysical surveys and sampling covering some 10 000 ha of the project area.
At the end of the 12-month period, Kennecott could elect to continue its exploration for a further five years, spending a total of $20-million on exploration to earn a 51% stake in the project area.
Article Enquiry
Email Article
Save Article
Feedback
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation















