Asanko optimistic following encouraging Q3 production
JOHANNESBURG (miningweekly.com) – Despite three mill motor outages impacting on output in July and August, the third quarter of the year ended on a more positive note for dual-listed Asanko Gold, with the company maintaining its revised guidance of 205 000 oz to 225 000 oz of gold for the full year.
While the Asanko Gold Mine (AGM), in Ghana, reported more than 5 000 oz of lost gold production during the first two months of the quarter under review, a “very respectable” 49 293 oz of gold was produced in the three months to September.
The processing plant's mill motor outages resulted in a total of 11 days of lost milling time.
This followed a decline in first-quarter production, which triggered the Canadian junior miner to lower its 2017 guidance in the second quarter to between 205 000 oz and 225 000 oz at an all-in sustaining cost (AISC) of $920/oz to $960/oz, from a previous guidance of between 230 000 oz and 240 000 oz at an AISC of $880/oz to $920/oz.
"Overall, our quarterly production performance for the third quarter was very encouraging, with positive results in a number of key areas: reconciliations confirming the Nkran resource model, management of ore losses and dilution and the plant achieving milling rates in excess of 13 500 t on a per-day campaign basis,” said Asanko president and CEO Peter Breese.
The company posted third-quarter gold sales of 50 241 oz at an average realised price of $1 265/oz, generating gold sales revenue of $63.6-million.
As at September 30, Asanko had a balance sheet of $60.7-million in unaudited cash, $1.4-million in gold receivables and $2.2-million in dore, with a market value of $3.7-million.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation