https://www.miningweekly.com

Arrowsmith Central silica sand project, Australia

8th November 2019

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Arrowsmith Central silica sand project.

Location
The project is located 270 km north of Perth, in Western Australia.

Project Owner/s
VRX Silica.

Project Description
The project has a probable ore reserve estimated at 18.9-million tonnes grading 99.6% silicon oxide.

The project is expected to produce 39.6-million tonnes over an estimated 25-year mine life.

The project will use a unique and flexible mining and rehabilitation method to maximise production and the recovery of rehabilitated mined areas.

This involves sequentially mining 8 m to 15 m of sand from below the base of the soil profile in 2.25 ha blocks, with up to eight blocks mined a year.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has an after-tax, ungeared net present value, at a 10% discount rate, of A$147.6-million and an internal rate of return of 60%, with a payback of 2.8 years.

Capital Expenditure
Capital expenditure is estimated at A$25.88-million.

Planned Start/End Date
Not stated.

Latest Developments
None stated.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
Not stated.

Contact Details for Project Information
VRX Silica, tel +61 8 9226 3780 or email info@vrxsilica.com.au.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Sika South Africa
Sika South Africa

Sika South Africa is a trusted partner for the nation’s infrastructure, commercial, residential, and industrial sectors.

VISIT SHOWROOM 
ECG Engineering
ECG Engineering

ECG provides specialised electrical engineering services to the Mining, Utilities, Materials Handling and Industrial industries, with extensive and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.046 0.724s - 111pq - 2rq
Subscribe Now