Arrowsmith Central silica sand project, Australia
Name of the Project
Arrowsmith Central silica sand project.
Location
The project is located 270 km north of Perth, in Western Australia.
Project Owner/s
VRX Silica.
Project Description
The project has a probable ore reserve estimated at 18.9-million tonnes grading 99.6% silicon oxide.
The project is expected to produce 39.6-million tonnes over an estimated 25-year mine life.
The project will use a unique and flexible mining and rehabilitation method to maximise production and the recovery of rehabilitated mined areas.
This involves sequentially mining 8 m to 15 m of sand from below the base of the soil profile in 2.25 ha blocks, with up to eight blocks mined a year.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The project has an after-tax, ungeared net present value, at a 10% discount rate, of A$147.6-million and an internal rate of return of 60%, with a payback of 2.8 years.
Capital Expenditure
Capital expenditure is estimated at A$25.88-million.
Planned Start/End Date
Not stated.
Latest Developments
None stated.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Not stated.
Contact Details for Project Information
VRX Silica, tel +61 8 9226 3780 or email info@vrxsilica.com.au.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation















