Ardmore phosphate rock project, Australia – update

Image of Australia flag/map

5th November 2021

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Ardmore phosphate rock project.

Location
North-west Queensland, Australia.

Project Owner/s
Centrex Metals.

Project Description
Ardmore is one of the few remaining undeveloped high-grade phosphate rock deposits in the world.

An updated definitive feasibility study (DFS) has confirmed the profitability and robustness of the project. The original DFS was completed in October 2018 and in February 2019 the company released the results of an optimised DFS, which has been used as the baseline for the August 2021 update. The project has a mine life of ten years, with production estimated at 800 000 wet tonnes a year.

Underlying mine designs and resulting ore reserves remained unchanged from the 10.1-million tonnes at 30.2% phosphorous pentoxide reported in the DFS.

Plant design, site layout, construction material quantities and erection/installation hour-estimate remain unchanged.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has a net present value, at a 7% discount rate, of A$ 207-million and a pretax internal rate of return of 52%, with a payback of less than two years.

Capital Expenditure
Preproduction capital is estimated at A$78.47-million. This compares with the capital investment of A$69-million in the 2019 optimised DFS to support the same parameters.

Planned Start/End Date
Not stated.

Latest Developments
Centrex Metals has completed a A$4-million share placement to fund work at its Ardmore rock phosphate project.

The company has received binding commitments for 44.4-million new shares from professional and sophisticated investors, priced at 9c a share.

The shares will be placed under the company’s existing placement capacity, and will not require shareholder approval.

Key Contracts, Suppliers and Consultants
GR Engineering Services (capital cost update).

Contact Details for Project Information
Centrex Metals, tel +61 8 8213 3100.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Willard
Willard

Rooted in the hearts of South Africans, combining technology and a quest for perfection to bring you a battery of peerless standing. Willard...

VISIT SHOWROOM 
SafeQuip
SafeQuip

SafeQuip is a leading distributor and manufacturer of fire safety solutions, offering a comprehensive range of products designed to meet all...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.042 0.795s - 111pq - 2rq
Subscribe Now