https://www.miningweekly.com
Copper|Mining|PROJECT|Surface|Drilling
Copper|Mining|PROJECT|Surface|Drilling
copper|mining|project|surface|drilling

American Pacific approves $12.8m budget for Alaska project

26th March 2024

By: Creamer Media Reporter

     

Font size: - +

CSE-listed American Pacific Mining has announced a $12.8-million budget for its high-grade volcanogenic massive sulphide-sulphate project, in Alaska.

Constantine North, a subsidiary of American Pacific, is the operator of the project, which is under a joint venture with Dowa Metals and Mining Alaska.

The 2024 programme has been designed to continue expanding the known extent of the high-grade copper mineralisation within South Wall Zones 1 and 2. The 2024 programme will also include a series of step-out drill holes to test the nearby North Wall Target.

The 2023 programme delivered the best four copper intercepts drilled to date at Palmer, highlighting the opportunity to define copper-rich zones within the known mineral resource envelope.

"During the 2023 resource definition programme, our team discovered thick copper mineralisation within the known mineral resource envelope. In 2024, we will look to leverage and build upon last year's high-grade results while aiming at expansion through step-out and extensional drilling along the high-grade trends in addition to discovery-focused drilling at the adjacent North Wall Target.

“The North Wall alteration zone represents an outstanding and untested, near-surface target with very limited historical drilling,” said CEO Warwick Smith.

The mineral resource estimate is set to be updated by year-end.

Edited by Creamer Media Reporter

Comments

Showroom

WearCheck
WearCheck

Leading condition monitoring specialists, WearCheck, help boost machinery lifespan and reduce catastrophic component failure through the scientific...

VISIT SHOWROOM 
VEGA Controls SA (Pty) Ltd
VEGA Controls SA (Pty) Ltd

For over 60 years, VEGA has provided industry-leading products for the measurement of level, density, weight and pressure. As the inventor of the...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024
Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.084 0.119s - 90pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: