Alt eyes future production
PERTH (miningweekly.com) – Mineral explorer Alt Resources on Friday told shareholders that the potential for near-term gold production existed within the tailings dam operations at the Bottle Creek project, in Western Australia.
Preliminary testing on the Bottle Creek tailings dams have estimated an average grade of 0.16 g/t gold and 6.1 g/t silver, based on 66 shallow aircore holes, the ASX-listed company told shareholders.
Alt’s aim with the with the drilling programme was to ascertain whether exploitable gold and silver remained within the tailing dam, with the company saying on Friday that a more comprehensive drill pattern is planned to cover the whole of each tailings area to more effectively delineate a volume that can be incorporated in the overall Bottle Creek gold resource.
“Our objective with this programme was to negate the cost of refurbishing the tailings dams. Given the right economics, in a future mining cycle we would strip the existing mineralised soil from the tailings dams, stockpile the soil for re-processing of the low-grade gold and silver and refurbish the dams at the same time,” said Alt CEO James Anderson.
“It’s a recycling concept to cover costs associated with development of the processing plant moving forward,” he added.
Anderson noted that the company is also progressing towards mine design and pit optimisation for the Bottle Creek operation, with consulting mining engineers engaged for this work.
“We are reinforcing our strategy to bring these assets into production as quickly and efficiently as possible, and we will continue to fast track this project,” he said.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation