Albany hydrothermal graphite project, Canada
Name and Location
Albany hydrothermal graphite project, Ontario, Canada.
Client
Zenyatta Ventures.
Project Description
A preliminary economic assessment (PEA) on the Albany project has indicated that the Albany project has excellent potential to be a low-cost source of high-purity graphite without having to use dangerous and environmentally harmful hydrofluoric acid or costly thermal upgrading.
The PEA proposes a 3 000 t/d openpit mine and process plant that will produce 30 000 t/y of high-purity (>99.9%) graphite over a 22-year mine life. It further proposes building an access road, a power and gas line to the property from near the Trans Canada Highway.
Planned infrastructure and facilities at the project site include a tailings management facility and handling facilities, as well as crushers and secondary buildings, including offices and workshops.
The PEA is based on mineral resources that are not mineral reserves and have not demonstrated economic viability; thus, there is no certainty that the results of this PEA will be realised.
Net Present Value/Internal Rate of Return
The project has a pretax net present value, at a 10% discount rate, of $614.68-million and an internal rate of return of 27%, with a payback of 3.7 years.
Value
The initial capital cost of the project has been estimated at $411.47-million.
Duration
Not stated.
Latest Developments
None stated.
Key Contracts and Suppliers
Not stated.
On Budget and on Time?
Not stated.
Contact Details for Project Information
Zenyatta Ventures, tel +1 807 346 1660, fax +1 807 345 4412 or email info@zenyatta.ca.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation
















