https://www.miningweekly.com
Construction|Copper|Design|Electrical|Engineering|flotation|Gold|PROJECT|Services|Waste|Waste Management|Water|Equipment|Waste
Construction|Copper|Design|Electrical|Engineering|flotation|Gold|PROJECT|Services|Waste|Waste Management|Water|Equipment|Waste
construction|copper|design|electrical|engineering|flotation|gold|project|services|waste-company|waste-management|water|equipment|waste

Alacran copper/gold project, Colombia

Location map of the Alacran project

Photo by Cordoba Minerals Corp

16th February 2024

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Alacran copper/gold project.

Location
Puerto Libertador, Colombia.

Project Owner/s
Cordoba Minerals Corp.

Project Description
A feasibility study has demonstrated an economically attractive project producing 39.5-million tonnes of mined material a year over a projected mine life of 14.2 years.

The project includes:

  • an openpit mine development, along with the required equipment fleet, and support infrastructures and services;
  • a 17 600 t/d conventional semiautogenous grinding ball mill crusher circuit and flotation process plant producing a copper concentrate and a high-grade gold and silver concentrate, with supporting infrastructures and services;
  • a separate wash gravity plant will process 2 400 t/d of saprolite ore and 1 200 t/d of historical tailings to produce a high-grade gold and silver concentrate;
  • a co-disposal waste rock with thickened tailings waste management facility;
  • other on-site infrastructures, including potable- and sewage-water treatment, an electrical substation, shops and other general facilities; and
  • relevant off-site infrastructures.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project holds a pretax net present value at an 8% discount rate of $633-million, and an internal rate of return of 33.9%, with a payback of 2.3 years.

Capital Expenditure
Initial capital expenditure is about $420.4-million for the construction of a conventional truck-and-shovel openpit mine.

Planned Start/End Date
Cordoba plans to start detailed mine engineering and design work at the project in early 2024.

Latest Developments
Cordoba has initiated a comprehensive process to assess funding options for the project.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Cordoba Minerals Corp (Colombia), tel + 57 4 605 15 07 or email info@cordobamineralscorp.com.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Latest News

Showroom

Willard
Willard

Rooted in the hearts of South Africans, combining technology and a quest for perfection to bring you a battery of peerless standing. Willard...

VISIT SHOWROOM 
Weir Minerals Africa and Middle East
Weir Minerals Africa and Middle East

Weir Minerals Europe, Middle East and Africa is a global supplier of excellent minerals solutions, including pumps, valves, hydrocyclones,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024
Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.095 0.148s - 93pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: