The Agua Rica project will be developed using infrastructure and facilities of a joint venture that Yamana has with Glencore and Newmont Goldcorp, in Argentina.
Project Description
A prefeasibility study (PFS) has significantly advanced Agua Rica and underscored the project as a long-life, low-cost project with robust economics and significant upside potential.
The project has proven and probable copper mineral reserves of 11.8-billion pounds and gold mineral reserves of 7.4-million ounces.
The PFS estimates a life-of-mine (LoM) of 28 years, with average production over the first ten years of about 533-million pounds of copper equivalent a year, including 107 000 oz/y of gold and contributions of molybdenum and silver. The project is expected to produce 452-million pounds of copper equivalent over the LoM. The PFS assumes a throughput rate of 110 000 t/d, with scenarios considering a higher throughput rate to be evaluated in the value-seeking study and subsequent full feasibility study.
The project will be integrated with the Alumbrera mine, which Yamana, Glencore and Newmont jointly own, thereby enhancing project economics, while reducing project complexity and its environmental footprint.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The project has an estimated net present value, at an 8% discount rate, of $1.94-billion and an after-tax internal rate of return
of 19.7%.
Capital Expenditure
The project has an initial estimated capital cost of $2.4-billion.
Planned Start/End Date
Not stated.
Latest Developments
A full feasibility study is expected to be completed by 2020.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Not stated.
Contact Details for Project Information
Yamana Gold, tel +1416815 0220 or email investor@yamana.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation