https://www.miningweekly.com

Abujar gold project, Côte d'Ivoire – update

Image of Abujar gold project ore samples, Côte d'Ivoire

16th July 2021

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Abujar gold project.

Location
Côte d’Ivoire.

Project Owner/s
Exploration and mining company Tietto  Minerals.

Project Description
The project has probable mineral reserves if 15.7-million tonnes run-of-mine at 1.7 g/t gold for 860 000 oz of gold.

A prefeasibility study (PFS) on the proposed 3.02-million-ounce project has shown it to be a robust, long life operation, based on the openpit mine development.

The Abujar AG openpit PFS forecasts production of 182 000 oz of gold in years

1 to 3, and more than 168 000 oz/y over the first six years of the project.

The project has a life-of-mine (LoM) of ten years. LoM recoveries are estimated at 1.08-million ounces of gold.

The expanded project, comprising the Abujar AG openpit PFS, APG openpit scoping study and AG underground study envisages average production of 182 000 oz/y  of gold in years 1 to 3, and 168 000 oz/y in years 1 to 6.

The project has an LoM of 12 years. LoM recoveries are estimated at 1.44-million ounces of gold.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The Abujar AG openpit PFS has a net present value (NPV), at a 5% discount rate, of $363-million and an internal rate of return (IRR) of 53%, with a payback of 2.4 years on initial capital.

The Abujar AG openpit PFS, APG openpit scoping study and AG underground study forecasts a pretax NPV, at a 5% discount rate, of $432-million and an IRR of 54%, with a payback of 2.4 years on initial capital.

Capital Expenditure
$230-million, including preproduction mining and contingency.

Planned Start/End Date
Tietto is targeting first gold at Abujar in the fourth quarter of 2022.

Latest Developments
Tietto is rapidly advancing Abujar development with early work programmes, including front-end engineering design, and site and camp construction under way.

Tietto expects to deliver a definitive feasibility study for Abujar in the third quarter of 2021.

Meanwhile, in July 2021, Tietto announced an increase in the Abujar project’s mineral resource estimate, following a 54 000 m diamond drilling campaign.

As a result of the campaign, gold resources have increased to 87.5-million tonnes grading 1.2 g/t gold for 3.35-million ounces.

AG mineral resources total 50.3-million tonnes grading 1.5 g/t gold for 2.45-million ounces.

APG mineral resources total 36.7-million tonnes grading 0.7 g/t gold for 870 000 oz.

Indicated resources have increased by 49% to 43.4-million tonnes grading 1.3 g/t gold for 1.85-million ounces of contained gold, representing more than 55% of the project ounces.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Tietto  Minerals, tel +61 8 9331 6710 or email admin@tietto.com.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

ABB Electrification
ABB Electrification

Electrifying the world in a safe, smart, and sustainable way, ABB Electrification is a global technology leader in electrical distribution and...

VISIT SHOWROOM 
Environmental Impact Management Services
Environmental Impact Management Services

EIMS is an independent specialised environmental consulting firm offering the full spectrum of environmental management services across all sectors...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.053 0.79s - 111pq - 2rq
Subscribe Now