https://www.miningweekly.com
Business|Construction|Copper|Crushing|Cyclones|Design|Dewatering|Engineering|PROJECT|Resources|Products
Business|Construction|Copper|Crushing|Cyclones|Design|Dewatering|Engineering|PROJECT|Resources|Products
business|construction|copper|crushing|cyclones|design|dewatering|engineering|project|resources|products

Speewah vanadium/titanium/iron project, Australia

17th May 2019

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Speewah vanadium/titanium/iron project.

Location
Speewah comprises the Central, Buckman and Red Hill deposits located on the western part of the Northern Australian Craton, in Western Australia.

Project Owner/s
King River Copper (KRC).

Project Description
The project consists of a laterally extensive magnetite gabbro that hosts vanadium/titanium/iron mineralisation.

The project has measured resources of 322-million tonnes at 0.32% vanadium pentoxide, 2% titanium and 14.9% iron, indicated resources of 1.05-billion tonnes at 0.33% vanadium pentoxide, 2% titanium and 14.9% iron; and inferred resources of 3.34-billion tonnes at 0.29% vanadium pentoxide, 2% titanium and 14.6% iron.

A scoping study has highlighted a positive business case for Speewah.

The scoping study envisages the establishment of the primary processing facilities on the mine site and then transporting the magnetic concentrate to a hydrometallurgical facility, in Wyndham, about 170 km to the north.

Primero has developed a conceptual design for an on-site beneficiation plant comprising:

  • The primary crushing of run-of-mine (RoM) ore and pebble crushing of semiautogenous grinding (SAG) mill discharge oversize (pebbles);
  • single-stage SAG milling, with classification cyclones targeting product of P80 of 0.5 mm;
  • rougher low-intensity magnetic separation/scavenger medium-intensity magnetic separation (MIMS) of mill product;
  • regrind of magnetic concentrate to P80 106 μm – 120 μm;
  • cleaner/recleaner MIMS producing final concentrate;
  • concentrate dewatering and stockpiling; and
  • tails dewatering.

A review of processing options has found that the highest extraction and most effective hydrometallurgical approach to recovering iron, titanium and vanadium from the magnetic concentrate is direct atmospheric hydrochloric acid leaching of the concentrate and solvent-extraction of vanadium pentoxide, titanium, and iron. The flowsheet comprises:

  • initial treatment, which is the acid leach;
  • iron recovery, producing either an iron oxide or iron metal;
  • titanium recovery, aiming to produce a pigment grade titanium dioxide;
  • vanadium recovery producing vanadium pentoxide flake; and
  • acid recovery, regenerating the leach acid for reuse.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
The total upfront capital cost to complete the project is currently estimated at between A$2-billion and A$2.5-billion. This estimate is based on preliminary engineering evaluation and scaling from industry benchmarks.

Planned Start/End Date
Based on positive outcomes and approvals, construction of the Speewah project could start in October 2021, with project commissioning potentially under way by November 2022 and full production in July 2023.

Latest Developments
King River has announced plans to broaden its product offering from the Speewah speciality metals project.

The announcement comes after the successful production of high-purity alumina (HPA) from the project.

King River is conducting metallurgical precipitation testwork at the Speewah project to produce vanadium pentoxide, titanium dioxide and iron oxide products, with the company also targeting other high-value speciality commodities such as HPA, magnesium oxide and vanadyl sulphate.

A prefeasibility study of Speewah is under way and is examining a number of process routes to extract these commodities.

Key Contracts and Suppliers
CSA Global (scoping study).

On Budget and on Time?
Too early to state.

Contact Details for Project Information
KRC, tel +61 8 9221 8055, fax +61 8 9325 8088 or email info@kingrivercopper.com.au.

 

Edited by Creamer Media Reporter

Comments

Showroom

Immersive Technologies
Immersive Technologies

Immersive Technologies is the world's largest, proven and tested supplier of simulator training solutions to the global resources industry.

VISIT SHOWROOM 
Weir Minerals Africa and Middle East
Weir Minerals Africa and Middle East

Weir Minerals Europe, Middle East and Africa is a global supplier of excellent minerals solutions, including pumps, valves, hydrocyclones,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024
Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.153 0.219s - 92pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: