Name of the Project
Speewah vanadium/titanium/iron project.

Location
Speewah comprises the Central, Buckman and Red Hill deposits located on the western part of the Northern Australian Craton, in Western Australia.

Project Owner/s
King River Copper (KRC).

Project Description
The project consists of a laterally extensive magnetite gabbro that hosts vanadium/titanium/iron mineralisation.

The project has measured resources of 322-million tonnes at 0.32% vanadium pentoxide, 2% titanium and 14.9% iron, indicated resources of 1.05-billion tonnes at 0.33% vanadium pentoxide, 2% titanium and 14.9% iron; and inferred resources of 3.34-billion tonnes at 0.29% vanadium pentoxide, 2% titanium and 14.6% iron.

A scoping study has highlighted a positive business case for Speewah.

The scoping study envisages the establishment of the primary processing facilities on the mine site and then transporting the magnetic concentrate to a hydrometallurgical facility, in Wyndham, about 170 km to the north.

Primero has developed a conceptual design for an on-site beneficiation plant comprising:

A review of processing options has found that the highest extraction and most effective hydrometallurgical approach to recovering iron, titanium and vanadium from the magnetic concentrate is direct atmospheric hydrochloric acid leaching of the concentrate and solvent-extraction of vanadium pentoxide, titanium, and iron. The flowsheet comprises:

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
The total upfront capital cost to complete the project is currently estimated at between A$2-billion and A$2.5-billion. This estimate is based on preliminary engineering evaluation and scaling from industry benchmarks.

Planned Start/End Date
Based on positive outcomes and approvals, construction of the Speewah project could start in October 2021, with project commissioning potentially under way by November 2022 and full production in July 2023.

Latest Developments
King River has announced plans to broaden its product offering from the Speewah speciality metals project.

The announcement comes after the successful production of high-purity alumina (HPA) from the project.

King River is conducting metallurgical precipitation testwork at the Speewah project to produce vanadium pentoxide, titanium dioxide and iron oxide products, with the company also targeting other high-value speciality commodities such as HPA, magnesium oxide and vanadyl sulphate.

A prefeasibility study of Speewah is under way and is examining a number of process routes to extract these commodities.

Key Contracts and Suppliers
CSA Global (scoping study).

On Budget and on Time?
Too early to state.

Contact Details for Project Information
KRC, tel +61 8 9221 8055, fax +61 8 9325 8088 or email info@kingrivercopper.com.au.