https://www.miningweekly.com
Consulting|Exploration|flotation|Health|Logistics|Mining|MSA|Nuclear|PROJECT|Projects|Resources|Services|Storage|Technology|Solutions|Environmental|Infrastructure
Consulting|Exploration|flotation|Health|Logistics|Mining|MSA|Nuclear|PROJECT|Projects|Resources|Services|Storage|Technology|Solutions|Environmental|Infrastructure
consulting-company|exploration|flotation|health|logistics|mining|msa|nuclear|project|projects|resources|services|storage|technology|solutions|environmental|infrastructure

Songwe Hills rare earths project, Malawi

Songwe Hills rare earths project, Malawi

9th September 2022

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Songwe Hills rare earths project.

Location
South-eastern Malawi, between Lake Chilwa and the Mulanje Massif.

Project Owner/s
Mkango Resources.

Project Description
Songwe Hill was confirmed in July 2022 as one of the very few rare earths projects worldwide to have reached the definitive feasibility study (DFS).

The DFS envisages Songwe as a standalone project selling mixed rare-earth carbonates, as opposed to separated rare-earth oxides, and excluding Pulawy, which has potential to add significant downstream value.

The DFS envisages a conventional openpit contract mining operation, feeding mills, flotation and hydrometallurgy plants on site to produce a mixed rare-earth carbonate, with an operating life (mining and processing) of 18 years.

Mkango says there is potential to increase the mine life given the additional inferred resource, the potential to expand the mineral resource and the exploration potential of the nearby Nkalonje project. The mixed rare-earth carbonate is expected to be shipped to the proposed Pulawy rare earth separation project, in Poland, for separation. The processing capacity is about one-million tonnes a year of ore to produce an average of 5 954 t/y of total rare-earth oxides in mixed rare-earth carbonate for the first five years, and 4 081 t/y of total rare-earth oxides in mixed rare-earth carbonate from years 6 to 18.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has an after-tax net present value (NPV), at a 10% (nominal) discount rate, of $559-million and an internal rate of return 31.5% (nominal), with a payback of 2.5 years from full production. The NPV excludes any value attributable to the proposed Pulawy project, which is expected to process mixed rare-earth carbonate from Songwe Hill.

Capital Expenditure
Initial capital expenditure is estimated at $277-million, excluding a $34-million contingency, for the development of the mine, mill, flotation and hydrometallurgy plants, tailings storage facility and related project infrastructure in Malawi.

Planned Start/End Date
The DFS envisages mining starting in February 2025, with processing expected to ramp up from July 2025 and full production from September 2025.

Latest Developments
None stated.

Key Contracts and Suppliers
The MSA Group (geology, mineral resource and geotechnical investigation); Bara Consulting (mining); Grinding Solutions (comminution); DRA Global Company subsidiary SENET (process plant, including on- and off-site infrastructure); Australian Nuclear Science and Technology Organisation (hydrometallurgy); KYSPY Investments and ALS Metallurgy (flotation); Epoch Resources (tailings storage facility); Digby Wells and Associates and Kongiwe Environmental (environmental-, social- and health-impact assessment); SGS Australia (geochemistry); Western Geotechnical and Laboratory Services (geotechnical testwork); Steinweg Bridge (logistics).

Contact Details for Project Information
Mkango Resources, tel +1 403 444 5979.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Showroom

Booyco Electronics
Booyco Electronics

Booyco Electronics, South African pioneer of Proximity Detection Systems, offers safety solutions for underground and surface mining, quarrying,...

VISIT SHOWROOM 
Booyco Electronics
Booyco Electronics

Booyco Electronics, South African pioneer of Proximity Detection Systems, offers safety solutions for underground and surface mining, quarrying,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (26/04/2024)
26th April 2024 By: Martin Creamer
Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024
Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.139 0.2s - 94pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: