https://www.miningweekly.com
Business|Coal|Energy|Eskom|generation|Power|System|Maintenance
Business|Coal|Energy|Eskom|generation|Power|System|Maintenance
business|coal|energy|eskom|generation|power|system|maintenance

Assessment of Eskom coal fleet warns ‘fixation on the EAF is a dead end’

1st March 2024

By: Terence Creamer

Creamer Media Editor

     

Font size: - +

The Vgbe report commissioned by the National Treasury to assess the state of the coal fleet  (23.70 MB)

An expert assessment of the state of Eskom’s 14 coal-fired power stations conducted between March and May 2023 describes the prevailing “fixation” on the coal fleet’s energy availability factor (EAF) as a “dead end” that is leading to poorer plant performance.

Conducted for the National Treasury by a Vgbe-led consortium, the report noted that outage and maintenance activities had been deferred over the last months and years to lift – or at least to maintain – the EAF.

Rather than restoring the plants to “as new conditions” after outages, the priority had instead been to “quickly” fix generation bottlenecks, which resulted in plants being forced to continue operating at the expense of their technical condition.

“The consequences are reflected in the high number of incidents, trips and partial load losses,” the authors state.

The cycle, they add, has gained so much momentum that it could lead to the collapse of plants or to further capacity losses.

“It must be stopped immediately by executing proper maintenance and outage work – even if this means a higher level of loadshedding for a limited period of time.

“Moreover, up to 6 000 MW in partial load losses could be reactivated by fixing the plants’ defects and applying prudent operation and maintenance practice.”

That said, the report also notes that, at about 51%, Eskom’s coal fleet EAF is much lower than international norms of 78% despite Eskom’s maintenance budgets being higher.

Nevertheless, the EAF recommendations in the assessment appear to conflict with Eskom’s Generation Recovery Plan, which is still premised on recovering the EAF to 65% by the end of March and to 70% by March 31, 2025.

The National Treasury said that some of the reports findings would be incorporated into Eskom’s 2024/25 Corporate Plan but did not offer specifics.

The assessment, which was compiled as part of an effort to understand the state of the coal fleet after the National Treasury extended a R254-billion debt-relief package to Eskom, attributed the low EAF to a “dysfunctional” and overly complex management system within Eskom Generation.

The report concludes that the solution lies in improving operation and maintenance and conducting these activities according to industry standards, including by decentralising decision-making and providing power station managers with “full budget responsibility and accountability”.

“This change in governance requires changes in the management structure of the Generation Division.

“The Vgbe team proposes decoupling the coal fleet from the rest of the generation business.

“The sole objective of this coal division should be the revitalisation of the existing power plants.”

The report was released on the same day that Dan Marokane formally took up his position as CEO of the embattled State-owned utility with a board instruction to assess the Generation Operational Recovery Plan during his first 100 days in office.

The board also indicated that he should prioritise a review of the unbundling plans and engagements with internal and external stakeholders.

Edited by Creamer Media Reporter

Comments

Showroom

Booyco Electronics
Booyco Electronics

Booyco Electronics, South African pioneer of Proximity Detection Systems, offers safety solutions for underground and surface mining, quarrying,...

VISIT SHOWROOM 
Universal Storage Systems (SA)
Universal Storage Systems (SA)

South African leader in Steel -Racking, -Shelving, and -Mezzanine flooring. Universal has innovated an approach which encompasses conceptualising,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024
Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:3.153 3.197s - 116pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: