West African gold mine signs solar power agreement
JOHANNESBURG (miningweekly.com) – West African gold mine Iamgold Essakane has signed a 15-year power purchase agreement with renewable-energy providers in a move that will cut its diesel use and lower its carbon footprint.
EREN Renewable Energy and its partner African Energy Management Platform (AEMP) on Monday announced that the 15 MWp, $20-million solar project would be built at the mine, which is located off-grid, 330 km from Ouagadougou, the capital of Burkina Faso.
On a 22 ha site, the project will sell the electricity produced from the solar plant to Iamgold Essakane, which is owned jointly by Toronto- and New York-listed Iamgold Corporation, with 90%, and the Burkino Faso government with 10%.
Global renewable energy independent power producer EREN, the 90% shareholder of the project company, and developer AEMP, the holder of the remaining 10%, expect to commission the solar farm by the end of 2017, reducing the mine’s fuel consumption by an expected six-million litres of diesel a year and carbon dioxide emissions by 18 500 t a year.
For mines that operate around the clock with energy budgets of 30% of operating costs, the hybridisation of diesel power plants with a renewable-energy source reduces energy costs, betters carbon and social footprints and hedges against oil price volatility, the renewable-energy companies said in a release to Creamer Media’s Mining Weekly Online.
The gold mine produced 400 000 oz of gold in 2015.
This project is EREN's second utility-scale project in Africa and will be one of the largest hybrid diesel solar photovoltaic projects in the world, EREN Africa business development VP Christophe Fleurence said.
It represents a breakthrough for industries relying on costly and carbon intensive diesel generation, which, until very recently, has been the only reliable source of electricity, added AEMP’s Richard Duffy.
Comments
The
functionality
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation