https://www.miningweekly.com

Voisey’s Bay to resume operations early next month

18th June 2020

By: Mariaan Webb

Creamer Media Senior Deputy Editor Online

     

Font size: - +

The Voisey’s Bay mine, in Labrador, Canada, is gearing up to resume operations, following a three-month shutdown associated with the Covid-19 outbreak.

Brazil’s Vale announced on Thursday that it had moved from care and maintenance into a planned maintenance period at Voisey’s Bay as a first step to resuming operations in early July. This includes restarting critical path activities related to the Voisey’s Bay mine expansion project. 

Full capacity should be reached by early August, the major added.

The company also announced that it was partnering with a private testing lab in Newfoundland & Labrador to provide extensive PCR testing of all employees entering the site. The enhanced testing capacity enables the early identification, tracing and stopping of the spread of any potential Covid-19 cases.

“The ability to mass test is in addition to the robust screening measures currently in place and offers greater knowledge and transparency of the number of people who may have had contact with the coronavirus, allowing for immediate action and avoiding large-scale infection,” Vale said in a statement.

The site has not reported any cases of Covid-19 to date.              

Voisey’s Bay is a fly-in, fly-out operation. The 6 000 t/d facility produces two types of concentrate: nickel/cobalt/copper concentrate and copper concentrate. Nickel concentrate produced at Voisey’s Bay is processed at the hydrometallurgical processing facility in Long Harbour, Newfoundland.

Edited by Creamer Media Reporter

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION