Vanadium recovery project, Finland

29th September 2022

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Vanadium recovery project (VRP 1).

Location
For the purpose of cost estimation, the Tahkoluoto port, in Pori, Finland, is the selected location for the
project, with plant offices, administration, ablutions facilities and a laboratory included in the
scope.

Project Owner/s
Emerging battery materials producer Neometals has the option to enter into a 50:50 incorporated joint venture to develop the VRP 1 with Australian mineral development company Critical Metals.

Project Description
The project aims to process and recover high-purity vanadium pentoxide from vanadium-bearing steelmaking by-product generated by SSAB EMEA AB and SSAB Europe Oy, collectively SSAB. A Class 3 engineering cost study (ECS) has confirmed the potential for lowest-quartile operating costs for the project.

This aligns with prior outcomes from the historical Neometals prefeasibility study (PFS).  The ECS envisages an operation with a throughput of 300 000 t/y for total production of 19.01-million pounds, or 8 642 t/y,
vanadium pentoxide. This compares with a throughput of 13.43-million pounds, or 6 091 t/y, vanadium pentoxide in the 2021 PFS.

Potential Job Creation
Not stated. 

Net Present Value/Internal Rate of Return
The 2021 PFS forecast a net present value, at a 10% discount rate, of $230.1-million and an internal rate of return of 31% on a 100% ownership basis, with a payback of about four years.

Capital Expenditure|
Capital costs have increased from $183.4-million in the PFS to $341-million in the ECS on a 100% ownership basis.

Planned Start/End Date
Operations are due start in December 2024.

Latest Developments
As part of the VRP1 evaluation activities, Neometals is finalising a feasibility study, which will include the findings from the ECS.

Key Contracts, Suppliers and Consultants
Hatch (PFS); and Sweco Industry Oy (ECS).

Contact Details for Project Information Neometals, tel +61 8 9322 1182 or email info@neometals.com.au.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION