https://www.miningweekly.com

Tajiri proves up for Strandline

7th October 2020

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – A scoping study into the Tajiri mineral sands project, in Tanzania, has estimated that the project could support a mine life of some 23 years, based on a mining rate of eight-million tonnes a year.

ASX-listed Strandline Resources on Wednesday reported that the scoping study estimated a pre-tax net present value of $205-million and an internal rate of return of 36%, with annual earnings before interest, taxes, depreciation and amortisation estimated at $0.9-billion.

Tajiri is expected to produce some 261 200 t/y of heavy mineral concentrate from a wet concentrator plant, some 16 000 t/y of rutile-leucoxene, 150 100 t/y of ilmenite and 60 700 t/y of zircon concentrate.

The project is expected to generate revenues of some $1.6-billion annually, at an all-in sustaining cost of $0.76.

The study is based on a mineral resource estimate of 268-million tonnes, at 3.3% total heavy minerals.

Strandline MD Luke Graham said the scoping study confirmed the technical and economic strength of the project.

“Tajiri, together with the more advanced Fungoni project, underpins Strandline’s exciting multi-decade production profile in Tanzania. Tajiri’s large Joint Ore Reserves Committee-compliant, titanium-dominated resource forms a solid basis for the study, with the design incorporating conventional mining and processing to recover highly marketable mineral sands products.”

Graham said that in light of the scoping study’s strong findings, Strandline will continue to advance the project permitting and development approvals, and will review strategic partnership options to assist in the next phase of project development, while also evaluating external funding options, including a strategic joint venture interest.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION