https://www.miningweekly.com

RDM’s TSF raise approved, says Equinox

1st June 2022

By: Creamer Media Reporter

     

Font size: - +

Dual-listed Equinox Gold has received approval for the tailings storage facility (TSF) raise at its RDM mine, in Brazil, with the contractor set to start work in early June.

The company previously suspended operations at the RDM mine, pending regulatory approvals for the TSF raise. Equinox said it would resume full operations by mid-July.

Equinox has withdrawn its 2022 production guidance for the RDM mine, forecast at 70 000 oz to 80 000 oz of gold, or about 11% of the consolidated production using the mid-point of the group’s 2022 guidance of 625 000 oz to 710 000 oz of gold.

The company will update the guidance in the first week of August.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION