https://www.miningweekly.com

Official sod-turning this month at West Rand tailings dump retreatment project

28th July 2023

By: Martin Creamer

Creamer Media Editor

     

Font size: - +

The official sod-turning ceremony for the construction of the Mogale tailings retreatment project is to take place before the end of this month.

The Mogale gold dumps contain a probable mineral reserve of 123.6-million tons of re-mineable material at a head grade of 0.29 g/t for an estimated content of 1.14- million ounces of gold.

The definitive feasibility study (DFS) points to fast payback, low costs, 25% production uplift, long life, high ungeared return and the upliftment of a depressed area, where there is low employment, illegal mining activity, and serious environmental degradation.

Seen as an important mining and rehabilitation development for the West Rand district, the project – being undertaken by London- and Johannesburg-listed Pan African Resources – is expected to produce an average of 50 000 oz of gold a year over 20 years.

Near Krugersdorp and Kagiso, west of Johannesburg, it is expected to provide economic opportunity, local procurement, and jobs during construction and ongoing operations.

Modern technology was employed to survey available tonnages across the project area, with historical holes twinned to verify previously reported head grades.

The DFS pointed to operating costs of R78/t and an all-in sustaining cost of $914/oz.

Standard hydro mining will be deployed and a large carbon-in-leach facility built, where the re-mined tailings will be processed with additional water treatment that will potentially improve gold recoveries.

At Pan African’s existing Elikhulu and Barberton tailings retreatment plants, tailings management has reduced the pollution load on the surrounding land and underground water resources. This has resulted in improved freshwater quality and lower levels of radiation and toxicology, allowing the re-introduction of indigenous flora and fauna species to the area, which has shown an ability to recover faster. These same benefits can now be extended to the West Rand facilities.

Solar power generation is also on the cards at Mogale by Pan African, which pioneered the 10 MW photovoltaic solar plant at Elikhulu. Targeted by the group is an overall 30 MW of solar capacity by 2024. This will produce about 75 000 MWh of power a year, save about R100-million a year in electricity bills and reduce group carbon emissions.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION