O3 Mining advances environmental permitting for Marban
Gold exploration and mine developer O3 Mining, an Osisko Group company, has taken a major step forward in the environmental permitting of the Marban Engineering project, in Quebec, having filed the initial project description and the project notice on federal and provincial levels.
The project will require approval by both levels of government through the environmental and social impact assessments (ESIA) process stipulated by the local regulations.
The ESIA will determine the environmental, social and economic impacts of the Marban Engineering project. As part of this process, both governments will consult with a broad range of stakeholders including host communities, indigenous communities, nongovernmental organizations and others.
“We believe that the rigorous regulatory framework in place in Québec and Canada enables the construction and operation of mines with the highest environmental and social standards in the world. Reaching zero impact is impossible but building a mine responsibly and minimizing its impact is essential.
"Our extensive work upstream to filing the Marban project with the governmental authorities is a testament to our commitment to ESG,” said O3 president and CEO Jose Vizquerra.
The Marban project will produce an average of 161 000 oz/y of gold. The September 2022 prefeasibility study calculated a net present value, using a 5% discount, of C$423-million and an unlevered internal rate of return of 23.2%.
Comments
The
functionality
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation