https://www.miningweekly.com

Sishen ultrahigh dense-media separation project, South Africa – update

1st March 2024

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Sishen ultrahigh dense-media separation (UHDMS) project.

Location
Northern Cape, South Africa.

Project Owner/s
Anglo American subsidiary Kumba Iron Ore.

Project Description
The project will maximise product quality and extend the life-of-mine (LoM) to 2039. The technology will allow for the processing of c-grade material previously classified as waste.

UHDMS is a specialised technology that has been locally developed. The project makes it possible for Kumba to increase the densities in the Sishen plant and DMS plant by a difference of between 3.6 and 4.2. This will enable Kumba to improve beneficiation so that it can upgrade its premium product from 18 % to 50 % a year.

Further, because the company can lower the cutoff grade, it can introduce about 130-million tonnes of reserves into its portfolio, which extends the LoM.

Potential Job Creation
About 53% of the population of the area is either directly or indirectly employed by the mine.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
Not stated.

Planned Start/End Date
Not stated.

Latest Developments
The UHDMS project is being reviewed to determine the optimal sequencing and timing in consideration of it business reconfiguration.

Kumba says in its Financial Statement 2023, released on February 20, 2024, that it remains confident that the UHDMS technology will play an essential role in positioning the business for a sustainable future.

The changes resulting from the optimisation of the mine plan will be incorporated into the project’s technical review.
Key Contracts, Suppliers and Consultants
Not stated. 

Contact Details for Project Information
Kumba Iron Ore manager corporate communication, Sinah Phochana, email Sinah.Phochana@angloamerican.com.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION