https://www.miningweekly.com

Metallurgic tests at PTM’s Waterberg discovery ‘exceeding’ expectations

15th May 2013

By: Henry Lazenby

Creamer Media Deputy Editor: North America

  

Font size: - +

TORONTO (miningweekly.com) – NYSE- and TSX-listed Platinum Group Metals (PTM) on Wednesday said initial test results from metallurgical samples of the T2 and F zones from the Waterberg platinum deposit was meeting or exceeding expectations.

PTM said estimated recoveries for platinum, palladium and gold in scoping flotation tests completed at SGS Laboratories, in South Africa, had averaged 88% for the T2 zone and 83% for the F zone.

The 10.1-million-ounce platinum, palladium and gold (3E) Waterberg deposit was discovered in November 2011 by PTM and its joint venture (JV) partners, including Jogmec of Japan.

The project currently had a Canadian National Instrument 43-101-compliant inferred resource of 93-million tons grading 3.39 g/t 3E, comprised 1.03 g/t platinum, 2.02 g/t palladium and 0.34 g/t gold.

"We are pleased with the initial results which are in line with or exceeding our expectations based on the character of the deposit. This is an important component of the preliminary economic assessment of the first block of the Waterberg project.

“We also look forward to an updated resource model for the assessment on the first 5.5 km of strike length by August and the opportunity to explore a further 25 km of untested potential, north from the JV property, during 2013 and 2014,” CEO Michael Jones said.

Drilling at the Waterberg project was currently progressing with 15 machines.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION