Merafe’s Q1 ferrochrome production up 10%
JOHANNESBURG (miningweekly.com) – The attributable production of ferrochrome company, Merafe Resources, increased by 10% in the first quarter of this year.
Attributable production was 113 000 t, up from last year’s first quarter output of 103 000 t.
The increase in the attributable ferrochrome output from the Glencore-Merafe Chrome Venture is primarily due to improved performances and efficiencies across the venture’s furnaces, coupled to the restarting of Rustenburg furnace 5 in the second half of 2016, the JSE-listed Merafe said on Tuesday.
The first quarter European benchmark ferrochrome price of $165/lb, applicable for the three months to March 31, was 6.7% higher than the current second quarter price of $1.54/lb, which is applicable in the three months to June 30.
Merafe, headed by CEO Zanele Matlala, shares in 20.5% of the earnings before interest, taxation, depreciation and amortisation (Ebitda) of the Glencore-Merafe Chrome Venture, the largest ferrochrome producer in the world with combined installed capacity of 2.34-million tonnes of ferrochrome a year.
The venture operates eight chromite mines and 22 ferrochrome furnaces.
The demand for ferrochrome is driven overwhelmingly by the production of stainless steel, which is projected to grow by 3.5% in 2017 and by 3.8% in 2018.
In the 12 months to December 31, Merafe’s share of the venture’s Ebitda was R1 176.2-million, 38% higher than in 2015.
Comments
The
functionality
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation