https://www.miningweekly.com

Merafe’s first-quarter chrome production down 1% y/y

25th April 2019

By: Marleny Arnoldi

Deputy Editor Online

     

Font size: - +

JSE-listed Merafe Resources’ ferrochrome production from the Glencore Merafe joint venture decreased by 1% in the quarter ended March 31 to 104 000 t, compared with the 105 000 t produced in the quarter ended March 2018.

The company previously stated that growth in demand was projected for ferrochrome globally, especially from Indonesia’s stainless steel industry.

Merafe also said Eskom’s power supply challenges remained a key risk factor for the joint venture this year.

To watch Creamer Media's latest video reports, click here
 

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION