Matsa upgrades Lake Carey resources
PERTH (miningweekly.com) – Junior Matsa Resources has reported a 27% increase in the mineral resource at its Lake Carey gold project, in Western Australia.
The ASX-listed company on Thursday reported that Lake Carey is now estimated to host some 654 000 oz of gold, at 2.6 g/t gold.
The increase to the mineral resource estimate included an updated mineral resource for the Devon pit and the Olympic prospect, as well as a maiden resource for the Hill East and Gallant prospects.
“Following the fantastic results of our Devon pit scoping study last well, I’m very pleased with these latest results demonstrating significant mineral resource growth since last year,” said Matsa executive chairperson Paul Poli.
“What’s really exciting is that not only has the global mineral resource increased in quantum, it has also seen a modest increase in grade. During the next quarter, we will have more drilling and assay results coming in and I expect we’ll also make significant headway into a Red October mineral resource update on the back of last year’s excellent Lion Fish, Marlin and Dory drilling results.”
The recent scoping study into the Devon pit, at Lake Carey, proved that mining operations could be economically viable and that the Devon pit could deliver a potential cash surplus of A$40.7-million over an estimated mine life of 12 months, with the production of around 37 000 oz of gold.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation