Bank to help accelerate Malawi’s energy-sector reform project
The World Bank has agreed to help fast-track the implementation of Malawi’s $84.7-million Energy Sector Support Project, which has faced delays.
The bank is funding the project, aimed at improving the operational capacity of Malawi’s hydro-based electricity sector and identifying alternative energy sources.
“The project is currently procuring consultants. We, therefore, expect acceleration in disbursement in the coming year, when procurement of goods begins,” says World Bank Malawi country manager Sandra Bloemankamp.
The bank says it resolved to ask the implementing agencies – the Ministry of Energy and the Electricity Supply Corporation of Malawi (Escom) – to fast-track the project because limi- ted procurement has taken place, which has resulted in the slow disbursement of funds.
The Energy Sector Support Project will include feasibility studies on a number of potential hydropower sites and the identification of diverse alternative energy sources.
The project will also include the rehabilitation, upgrading and expansion of Escom’s transmission and distribution networks.
Malawi, which derives 94% of its electricity from hydro sources, has six hydropower plants on the Shire river and a mini hydropower plant at Wovwe, in the country’s northern region.
The country has other potential sites for power generation on the Shire and other smaller rivers that are capable of producing over 1 000 MW of electricity. The Malawi government is hoping for World Bank support to develop these potential sites and explore prospects of generating power from alternative sources such as solar, wind and biogas to feed into the national grid. Meanwhile, it was reported last month that ASX-listed energy group NuEnergy Gas had launched an airborne geophysical exploration campaign for shale gas and coal-bed methane at its 346 km2 licence area in the district of Chikhwawa, in the lower Shire Valley area. The airborne geophysical survey is part of ongoing geological studies at the site.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation