https://www.miningweekly.com

INPEX moves away from Fifo

1st December 2020

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – Japanese liquefied natural gas (LNG) producer INPEX has reportedly announced plans to halt fly-in, fly out (Fifo) operations in both the Northern Territory and Western Australia, requiring its workforce to  move to those states by 2023.

INPEX VP of corporate coordination, Bill Townsend, was quoted as saying that the changes would impact some 120 employees.

“Currently, our operations workforce is dispersed throughout Australia. Under the new model, our offshore workforce will be fully based in Western Australia and our onshore operations workforce will reside in the Northern Territory,” he was quoted by the Brisbane Times.

"We realise individual circumstances vary and people need adequate time to consider the new arrangements and to relocate if necessary."

INPEX produces LNG from its Ichthys project, off the coast of Western Australia, with the gas then sent to its processing facility in Darwin.

The Western Australian Chamber of Minerals and Energy has welcomed the announcement, with director of policy and advocacy Rob Carruthers saying the decision would have important long-term benefits for the Western Australian economy and the communities in which INPEX operates.

“It’s very pleasing to see INPEX join the likes of BHP, Rio Tinto and Woodside by making this commitment to a local workforce model,” Carruthers said.

“With projects such as Ichthys and Bayu-Undan and interests in the Prelude facility and the Van Gogh and Novara oil fields, INPEX is one of the Western Australian oil and gas sector’s major employers.

“To have the employees of INPEX’s offshore facilities, plus their families, living in Western Australia is a potentially significant boost for regional communities and will also deliver meaningful economic outcomes as the State continues its recovery from Covid-19.”

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION