https://www.miningweekly.com

Hishikari mine, Japan

22nd April 2022

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Mine
Hishikari mine.

Location  
Northern Kagoshima Prefecture, in Japan.

Mine Owner/s  
Sumitomo Metal Mining (SMM).

Brief Description  
Hishikari mine is the only metals mine in Japan that operates on a commercial scale and has the highest gold production.

Brief History  
Hishikari has been producing gold since 1985. The mine is characterised by its high grade of 20 grams of gold per ton, or about five times the average. The mine continues to produce about six tons of gold a year.

Primary Metals/Minerals  
Gold.

Secondary Metals/Minerals  
None stated.

Geology/Mineralisation  
The ore deposits of the Hishikari mine are known as epithermal vein-type deposits and are believed to have formed about one-million years ago.

Reserves  
Recoverable gold reserves as at December 31, 2020, were estimated at 159 t of gold.

Resources  
Not disclosed.

Mining Method  
Underground.

Major Infrastructure/Equipment  
Underground, drilling machines (jumbo) are used drill holes in the ore veins, with the holes filled with explosives thereafter. Ore is collected by special loading equipment. Collected ore is loaded onto dump trucks and transported to the surface for processing.

On the surface, the mined ore is crushed into palm-sized pieces and sorted by automated machines and by hand. The separated gold ore is loaded into a gold ore carrier at the Port of Kajiki, in Kinkowan, and is transported to the Toyo Smelter & Refinery.

Prospects  
SMM is promoting the remote and unmanned operation of heavy machinery and information infrastructure equipment inside and outside of the Hishikari mine.

Contact Details
SMM
Tel +81 995 26 3111
Website https://www.smm.co.jp/

Sources
Sumitomo Metal Mining. Annual Integrated Report 2020.
Sumitomo Metal Mining. Website https://www.smm.co.jp/ [accessed March 15, 2022].

 

 

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION