https://www.miningweekly.com

Early close for two AGL coal-fired power stations

10th February 2022

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – The Australian government has expressed concern about energy generator AGL’s decision to exit coal, with the company announcing on Thursday that it would bring forward the closure of its Bayswater and Loy Yang A power stations in New South Wales and Victoria. 

During its first-half results announcement, AGL announced that it would bring forward its coal closure dates to no later than 2033 for Bayswater power station from 2035, and 2045 for Loy Yang A power station from 2048.

“While this announcement is a commercial decision and AGL has complied with the minimum 3.5-year notice period, the exit of such a considerable amount of reliable generation is a concern for the continued reliability and affordability of the system,” said Federal Industry, Energy and Emissions Reduction Minister Angus Taylor.

“Delivery of new, timely, replacement dispatchable capacity will be critical in keeping prices low and the lights on. 

“We have seen what happens when this does not occur, with prices skyrocketing by 85% following the premature closure of the Hazelwood power station in 2017. Energy is an essential service, and the government expects the market to step up to keep the lights on and prices low. 

“AGL’s long-term plans for developing the sites of these generators as industrial energy hubs, and their plans for investment in new dispatchable capacity are welcome. As we saw with the announced closure of Liddell, proposals for new projects are not enough. It is critical that private sector announcements translate to actual investments,” Taylor said.

He said that the government would closely monitor and model the impact of these closures, to hold industry to account on the dispatchable capacity needed to ensure affordable, reliable power for consumers.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION