https://www.miningweekly.com

Cummins Range rare earths project, Australia

20th October 2023

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Cummins Range rare earths project.

Location
Kimberley region of Western Australia.

Project Owner/s
RareX.

Project Description
An enhanced scoping study has proposed a three-stage development approach for the project, with the Stage 1 direct shipping ore (DSO) operation expected to produce 300 000 t/y of phosphate over a three-year period.

The Stage 2 project will entail the installation of a midsized beneficiation plant to produce 550 000 t/y of phosphate/rare-earth minerals concentrate from the weathered resource.

Stage 3 involves the upgrade of the Stage 2 plant in Year 13 of operations to produce a concentrate from unweathered, fresh rock below 130 m.

The project will have an 18-year mine life.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Stage 2 has a pretax net present value of A$549-million and an internal rate of return of 39%, with a payback of 1.41 years. Stage 1 has a payback if 1.65 years and Stage 2 has a payback
1.69 years.

Capital Expenditure
Stage 1 has an estimated capital cost of A$45-million.

Stage 2 is estimated at A$304-million.

Stage 3 will require a further investment of A$63-million.

A mine closure cost of A$41-million has been allocated at the end of Stage 3.

Planned Start/End Date
Not stated.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
RareX, tel +61 8 6383 6593 or email info@rarex.com.au.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION