https://www.miningweekly.com

Chile government to consider copper producers' cost variations in new royalty bill

13th June 2022

By: Reuters

  

Font size: - +

SANTIAGO – The disparity in costs faced by different copper mining companies in Chile will be taken into account in an industry-wide royalty planned by the government to help finance its ambitious social agenda, the undersecretary of Mining said on Friday.

A study by the national Chilean Copper Commission (Cochilco) revealed that the cash costs for Chile's largest operators rose by 10c/lb in year-on-year terms in 2021, due to the lower quality of the ore as well as higher energy and transportation prices.

The document also states that smaller operators, consisting of those who produce less than 150 000 t annually, have been the most affected by these changes.

"One of the important things that has been salvaged from everything that has been presented is the diversity in the mining sector," Undersecretary Willy Kracht said at a conference while delivering the report.

"It seems to me that it is tremendously relevant to put this on the table when we are in the middle of discussions on the royalty. It seems that it is an element that must be considered," he added.

In addition, Cochilco pointed out costs will likely rise again this year due to the crisis in Ukraine, and due to the persistent drought, which could lower production across some areas in Chile, the world's largest producer of copper.

The government of President Gabriel Boric has made increasing tax collection on mining activity part of its broad tax reform plan, the full details of which should be announced in the coming weeks.

The project could replace or modify a controversial clause being considered in Congress, which the industry has harshly criticized for not considering the operational performance of each site.

In addition to the state-owned Codelco, global mining companies such as BHP, Glencore, Anglo American, and Antofagasta operate in Chile.

Edited by Reuters

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION