Name of the Project
Carolina lithium project.

Location
Gaston County, North Carolina, US.

Project Owner/s
Piedmont Lithium.

Project Description
An updated scoping study has confirmed that Carolina will be one of the world’s biggest and lowest-cost producers of lithium hydroxide.

The project has mineral resources of 39.2-million tonnes grading 1.09%lithium oxide.

The project is expected to produce about 4.96-million tonnes of 6% lithium oxide spodumene concentrate (SC6), averaging about 248 000t/y of SC6 over the 20-year mine life. The project envisages production targets of 4.83-million tonnes of quartz concentrate, 7.51-million tonnes of feldspar concentrate, and 1.34-million tonnes of mica concentrate over the life of operations.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has an after-tax net present value, at an 8% discount rate, of $1.92-billion and an internal rate of return 31%, with a payback of 2.9 years from the start of operations.

Capital Expenditure
$838.6-million.

Planned Start/End Date
Construction is expected to start in April 2022, with commissioning expected in December 2023.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
Primero Group (concentrate operations and overall study integration); Metso Outotec (lithium hydroxide manufacturing technology package); SGS Lakefield (metallurgical testwork); Marshall Miller and Associates (mine design and scheduling); McGarry Geoconsulting Corp (mineral resource estimation); Minviro (life cycle analysis); HDR Engineering (permitting, environment, and social studies); Johnston, Allison, and Hord (land title and legal); Benchmark Mineral Intelligence (lithium products marketability) and John Walker (by-products marketability).

Contact Details for Project Information
Piedmont Lithium, tel +61 8 9322 6322 or email info@piedmontlithium.com.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION