Base hoping for Kwale-size operation at Toliara
PERTH (miningweekly.com) – Mineral sands producer Base Resources was hoping to develop its Toliara sands project, in Madagascar, into a similar size operation as its Kwale mineral sands project, in Kenya.
“It has to be strategically relevant, and it won’t make sense to us if the operation is smaller than Kwale,” Base MD Tim Carstens told Mining Weekly Online on the sidelines of the Africa Downunder conference, in Perth.
Based on the current resource of 857-million tonnes, the Toliara sands project had sufficient resources to support a mine life of around 40 years, with a project scale similar to Kwale, which averages yearly production of 80 000 t of rutile, 360 000 t of ilmenite and 30 000 t of zircon.
A prefeasibility study on Toliara is due in the first quarter of 2019, while a definitive feasibility study is targeted for the end of the third quarter, Carstens said.
Debt financing for the project is expected to be in place by the fourth quarter of next year, allowing Base to make a final investment decision on the project. If a positive investment decision is taken, construction activity at Toliara will start in the fourth quarter of 2019, allowing operations to start at the tail-end of 2021, which Carstens said would coincide with a demand-driven supply shortage in the mineral sands market.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation