Name of the Project
Eneabba rare earths refinery.

Location
Eneabba, Australia.

Project Owner/s
Iluka Resources.

Project Description
Eneabba is the highest-grade rare earths operation globally.

It comprises Iluka’s stockpile of the rare-earth-bearing minerals monazite and xenotime, as well as the company’s Phase 1 (screening) and Phase 2 (concentrating) plant.

Phase 3 (refinery) will build on this existing operation to deliver a significant downstream infrastructure asset comprising roasting, leaching, purification, solvent extraction and product finishing.

Iluka’s refinery will produce the high-value rare-earth oxides neodymium, praseodymium, dysprosium and terbium.

The refinery will have a feed capacity of 55 000 t/y to produce 17 500 t/y of total rare-earth oxide and will initially be fed from the Eneabba stockpile. Potential future sources of feedstock include Iluka’s Wimmera operation and other deposits, as well as third parties.

Potential Job Creation
The project will have a construction workforce of about 300 people and an operational workforce of about 270 people.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
Between A$1.7-billion and A$1.8-billion.

Planned Start/End Date
The refinery commissioning is scheduled for 2026.

Latest Developments
Iluka Resources confirmed a major cost overrun at its Eneabba rare earths refinery on February 21, stating that the project would cost between A$1.7-billion and A$1.8-billion.

This is at the top-end of the A$1.5-billion to A$1.8-billion guidance range provided in December, when the company first flagged a cost blowout.

“Inflation has affected nearly all major resources projects in Western Australia in recent times and Eneabba has not been immune,” MD Tom O’Leary has said.

According to an article in the Financial Review, Iluka is in talks with the Australian government to “come to a pathway to deliver the refinery”.

Key Contracts, Suppliers and Consultants
Fluor Corporation – Mining & Metals (engineering, procurement and construction management).

Contact Details for Project Information
Iluka group manager, investor relations and corporate affairs Luke Woodgate, tel +61 8 9360 4785 or email luke.woodgate@iluka.com.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION