https://www.miningweekly.com

Yamana likely to review 2020 targets as mines track above guidance

14th July 2020

By: Mariaan Webb

Creamer Media Contract Publishing Editor

     

Font size: - +

Canadian precious metals miner Yamana Gold on Monday reported strong second-quarter production results, with its output currently tracking above its revised guidance for the year.

The dual-listed miner produced 164 141 oz of gold and 2.01-million ounces of silver, for total gold equivalent ounce (GEO) output of 183 582 in the June quarter.

“Overall production and production from most mines exceeded plan and the production for the quarter implied in the company’s annual guidance,” Yamana stated in its second-quarter results announcement, noting that it would evaluate further updates to its guidance in the third quarter.

Yamana revised its guidance on April 30, to reflect the temporary suspension at Canadian Malartic, in Canada, and Cerro Moro, in Argentina. Its current 2020 guidance is to produce 786 000 oz of gold and 10.25-million ounces of silver, for GEO output of 890-million in the year.

The company on Monday updated its cost guidance, noting that the impacts of Covid-19 were now better understood. Its all-in sustaining cost guidance for the second half of the year would be in the range $1 020/GEO to $1 060/GEO.

Its AISC in the second quarter was $1 125/GEO.

Production is expected to weight into the second half of the year, with 54% of production expected in the last six months, compared with 46% in the first half.

The June quarter was highlighted by exceptional operational performances from Jacobina, in Brazil, El Peñón and Minera Florida, in Chile, as well as Canadian Malartic, all of which exceeded planned production targets.

Canadian Malartic resumed operations on April 15, following the government of Quebec’s decision to designate mining activities as an essential service. The ramp-up progressed faster than expected and mill throughput in May and June exceeded 60 000 t/d, partially offsetting the impacts from the downtime and lower production rates during the ramp-up in April.

Yamana said it continued to advance studies related to the underground mineral resources at Canadian Malartic, and it was continuing exploration efforts with ten diamond drill rigs to define and expand underground mineral resources. 

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Egoli Gas (Pty) Ltd
Egoli Gas (Pty) Ltd

As a reticulator, Egoli Gas provides natural gas to homes and businesses via underground pipes.

VISIT SHOWROOM 
Vikela Aluvin (Pty) Ltd
Vikela Aluvin (Pty) Ltd

Complete range of security sealing solutions including security seals bags and labels.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.05 1.002s - 110pq - 2rq
Subscribe Now