Western Areas hopes for stellar year
PERTH (miningweekly.com) – Nickel miner Western Areas is tracking at the upper end of its full-year guidance following a strong March quarter, with the miner also reporting its lowest unit cash costs since June 2015.
The total tonnes of nickel-in-concentrate produced during the March quarter dropped slightly from 5 844 t to 5 672 t, compared with the previous quarter, while the total tonnes of nickel sold also dropped from 6 249 t to 5 397 t over the same period.
Western Areas told shareholders on Wednesday that nickel recovery for the quarter was slightly lower than the previous quarter, owing to the inclusion of lower grade ore sorter feed into the blend.
Despite the decline in production, Western Areas reduced its cash costs for the nickel-in-concentrate from A$2.35/lb to A$2.23/lb in the quarter, following the addition of an ore sorter as part of the company’s ongoing innovation and cost reduction/efficiency programme.
After a successful initial two-month trial period, the ore sorter programme was extended to process the entire Flying Fox low-grade stockpile, and during the quarter under review, some 115 820 t of low-grade ore was processed, producing 52 010 t of fines and 13 575 t of accepts.
The ore sorting programme will be completed in the June quarter of this year.
“Our ability to reduce unit costs to their lowest level since June 2015, mostly through innovative operational improvements, such as the ore sorter, is pleasing,” said Western Areas MD Dan Lougher.
“At the same time, we have increased the mineral resource at Spotted Quoll, delivered a positive prefeasibility study and had one of the highest grade nickel intersections ever recorded globally over significant width at Odysseus.”
The study found that Odysseus could deliver an average of 12 000 t/y of nickel-in-concentrate over an initial seven-and-a-half-year mine life.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation