West Rand tailings retreatment project, South Africa
Name of the Project
West Rand tailings retreatment project (WRTRP).
Location
Gauteng, South Africa.
Client
DRDGold is acquiring the project from Sibanye-Stilwater.
Project Description
The WRTRP involves 1.3-billion tonnes of tailings material containing 11-million ounces of gold and 170-million pounds of uranium.
According to previous reports from Sibanye-Stilwater, the project will entail turning the material into a slurry, transporting it to a plant, extracting the gold, uranium and sulphur from the Cooke, Driefontein and Kloof complexes, and then depositing the residue on a deposition site.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
Sibanye-Stilwater previously estimated a net present value of R4-billion, with an internal rate of return of 33% at a gold price of R600 000/kg, which does not take into account any of the additional benefits from annuity resources.
Value
Sibanye-Stilwater previously estimated Phase 1 to cost R9.6-billion. Should extra modules be added incrementally, the total capital bill is expected to be from about R12.5-billion to R13-billion.
Duration
Not stated.
Latest Developments
DRDGold, which is acquiring the WRTRP from Sibanye-Stilwater, expects the project to generate a profit of R229.4-million for the 12 months ending December 31, 2019.
The profit forecast is based on throughput of 500 000 t/m at a recovered grade of 0.29 g/t; working costs per ton processed are R63.97 and a gold price of R564 245/kg.
The WRTRP is valued at R2.1-billion.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Not stated.
Contact Details for Project Information
Sibanye Gold senior VP: investor relations James Wellsted, tel +27 11 278 9600 or email james.wellsted@sibanyegold.co.za.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation

















