https://www.miningweekly.com

Vale says Q2 output rises 5.5% despite pandemic

21st July 2020

By: Reuters

  

Font size: - +

Brazilian miner Vale said on Monday that its second-quarter iron-ore production totalled 67.6-million tonnes, up 5.5% from a year earlier and 13.4% higher than the first quarter, despite the impact of the novel coronavirus.

Vale said it was keeping its full-year outlook for iron ore fines production unchanged at 310-million to 330-million tonnes, but emphasised that the most probable scenario was for output to be at the lower end of that range.

The result comes soon after iron-ore prices surged to their highest level in almost a year last week, above $111 a ton, amid a shortage of world supply as China reopens its economy. China has been boosting imports for the key steel ingredient.

Vale's key northern Brazilian mine S11D reached a annualized "run-rate" of 91-million tonnes in June, likely to improve further in the second half, pushing annual production slightly above 85-million tonnes, it said.

Nevertheless, a negative impact on production from the coronavirus of 3.5-million tonnes offset much of the improvements in the north.

Vale has been trying to recover output since a tailings dam in the town of Brumadinho burst early last year, killing some 270 people and forcing many similar structures to be shut down.

Edited by Reuters

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Werner South Africa Pumps & Equipment (PTY) LTD
Werner South Africa Pumps & Equipment (PTY) LTD

For over 30 years, Werner South Africa Pumps & Equipment (PTY) LTD has been designing, manufacturing, supplying and maintaining specialist...

VISIT SHOWROOM 
Lilak Aluminium
Lilak Aluminium

For over 15 years, Lilak Aluminium, a trusted leader in architectural extrusion supply, has delivered excellence to businesses like yours.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.061 1.008s - 128pq - 2rq
Subscribe Now