https://www.miningweekly.com

Triton cuts costs at Ancuabe pilot plant

11th January 2022

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) - Graphite developer Triton Minerals has identified $7-million in alternative funding options for the commercial pilot plant (CPP) at its Ancuabe graphite project, in Mozambique.

The company told shareholders that the alternative funding options would result in a 13% to 22% reduction in initial funding requirements for the CPP.

The options under review include the potential use of contractors, service providers, and equipment leasing for crushing, village infrastructure, mobile equipment and light vehicles and power supply.

Triton noted that the alternative funding options were aimed at a 250 000 t/y plant capacity, producing 15 000 t/y to 17 000 t/y of graphite concentrate, as proposed in the CPP desktop study.

Triton executive director Andrew Frazer said that the alternative options would positively impact discussions with debt providers for the debt portion of the CPP financing, which Triton will continue in the first quarter of this year.

Triton previously estimated that the CPP would require a capital investment of between $32-million and $52-million, which was significantly less than the $99-million estimate for the 60 000 t/y plant considered in the definitive feasibility study (DFS).

Refinement of the CPP desktop study is ongoing, and along with a strategic review into the Ancuabe project, will be completed before the end of this quarter, while a DFS for the CPP and a final investment decision are expected by mid-2022, allowing for first production by the third quarter of 2023.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Advanced Fire Suppression Technologies
Advanced Fire Suppression Technologies

Established on 1 March, 2000, by Barries Barnard, Advanced Fire Suppression Technologies (AFST) and the Advanced Group stands as Sub-Saharan...

VISIT SHOWROOM 
Virtual Gas Network (Pty) Ltd
Virtual Gas Network (Pty) Ltd

Virtual Gas Network supplies compressed natural gas via a virtual gas distribution network.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.041 0.921s - 110pq - 2rq
Subscribe Now