Titanium production project, Saudi Arabia
Name and Location
Titanium production project, Qahma region, Saudi Arabia.
Client
Ministry of Petroleum and Mineral Resources.
Project Description
The Ministry of Petroleum and Mineral Resources is assessing an integrated project that will produce titanium by using ilmenite, which is locally available in the Qahma region and in the coastal area of the southern region.
The project includes a plant to produce 500 000 t/y of titanium ore and 235-million tons a year of cast iron, another plant to produce 120-million tons a year of titanium dioxide and a third plant to produce 20-million tons a year of titanium powder. In addition, a specialised plant will produce 50-million tons a year of high-tech final and semifinal titanium products used in desalination applications, in the oil, gas and chemicals industries and in aircraft parts, organ transplants and many other industries.
The project will also feature a plant to produce white pigments used as additives in the plastics industry and another to produce zirconium oxychloride used in manufacturing of zirconium compounds and catalysts.
Value
The estimated capital cost of the project is SR5.2-billion.
Duration
Not stated.
Latest Developments
None stated.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Not stated.
Contact Details for Project Information
Ministry of Petroleum and Mineral Resources, tel +966 1 478 1661 or fax +966 1 479 3596.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation














