https://www.miningweekly.com

Superior Lake zinc mine restart project, Canada

2nd November 2018

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Superior Lake zinc mine restart project.

Location
The project is located in Ontario, Canada.

Client
Superior Lake Resources.

Project Description
A restart study has confirmed that the Superior Lake project has the potential to be one of the lowest-cost zinc producers globally.

The project includes a 1 000 t/d concentrator, comprising a comminution circuit and a two-stage flotation circuit for copper and zinc respectively. The plant will produce 88 000 t/y zinc concentrate and 6 700 t/y of copper concentrate over a six-and-a-half-year mine life.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has a pretax net present value, at a 10% discount rate, of $164.8-million and an internal rate of return of 56%.

Value
Start-up capital is estimated at $75.15-million.

Duration
Not stated.

Latest Developments
The restart study has given the board confidence to advance the project towards a definitive feasibility study, which it aims to complete by mid-2019.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
Not stated.

Contact Details for Project Information
Superior Lake Resources, tel +61 8 6142 5088, fax +61 8 9200 5638 or email info@superiorlake.com.au.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Hanna Instruments (Pty) Ltd
Hanna Instruments (Pty) Ltd

We supply customers with practical affordable solutions for their testing needs. Our products include benchtop, portable, in-line process control...

VISIT SHOWROOM 
Iritron
Iritron

Iritron delivers advanced automation, control, and optimisation solutions to the Mining, Minerals & Metals, Consumer Package Goods and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.056 0.846s - 111pq - 2rq
Subscribe Now