https://www.miningweekly.com
Africa|Automation|Building|Energy|Engineering|engineering news|Gold|Installation|Mining|Power|PROJECT|Projects|SECURITY|Sensors|Solar|Storage|Surface|System|Technology|Underground|Equipment|Operations
Africa|Automation|Building|Energy|Engineering|engineering news|Gold|Installation|Mining|Power|PROJECT|Projects|SECURITY|Sensors|Solar|Storage|Surface|System|Technology|Underground|Equipment|Operations
africa|automation|building|energy|engineering|engineering-news|gold|installation|mining|power|project|projects|security|sensors|solar|storage|surface|system|technology|underground|equipment|operations

Strongly recovering South Deep gold mine earmarked for advanced technology

Gold Fields CEO Nick Holland

Gold Fields CEO Nick Holland

Photo by Creamer Media's Donna Slater

27th November 2020

By: Martin Creamer

Creamer Media Editor

     

Font size: - +

A number of automation projects are being considered at Gold Fields’ South Deep, the bulk mechanised underground gold mine in Gauteng, south-west of Johannesburg.

After reporting 7% higher overall group year-on-year production of 557 000 oz for the three months to September 30, Gold Fields CEO Nick Holland said of South Deep, which has one of the world’s largest gold deposits: “South Deep has had a tremendous recovery in quarter three. We showed very good results.”

South Deep’s production was up to 65 000 oz, with all-in costs at just over $1 000/oz.

“South Deep’s an operation now that’s looking really competitive in our group,” Holland said.

South Deep, which has a mineral reserve of 38-million ounces, equivalent to close to 100 000 gold bullion bars, has a current life-of-mine of 75 years.

On automation progress at the underground South Deep, Holland said in response to Engineering News & Mining Weekly: “I think the most important advance is the control room we have, whereby we’re getting more real-time information about what’s happening across the value chain.

“We’re looking at remote loaders underground that will be operated from surface and that project is still trialing. Impact breakers underground are being monitored from surface and we’re also looking to have sensors on all of our equipment so we can monitor where they are and their condition. Those are the main subject areas that we’re working on at the moment, but it’s very much an incremental approach across the value chain,” said Holland.

On whether South Deep was lagging Gold Fields operations in countries such as Australia, Holland said: “I don’t think we’re necessarily behind. It’s more a function of some of the original-equipment manufacturers (OEMs) having not yet released some of the latest prototypes to South Africa, like battery electric vehicles.

“We want to try the battery electric vehicle underground, but the OEMs have not yet released the prototypes to South Africa. They will do it in the next 18 months, whereas in other countries they have released it. So, we’re very much in the hands of the suppliers. We know what to do, we’re in touch with people, we travel to the countries where this technology exists. So, we know what’s there and we have a clear roadmap to put it in place over time.”

On South Deep’s upcoming 40 MW solar energy installation potentially accommodating a green hydrogen element, Holland said there was a wait-and-see on the possibility of green hydrogen.

“Let’s get it working first. The idea is to reduce our reliance on Eskom and we believe that, if you look at the average usage, we could be able to reduce our Eskom usage by maybe 15% to 20%. That will already be a massive boost for us. We do need a baseload to keep the mine cooling, refrigeration and ventilation going and running the shaft system, so there’s quite a lot of power that’s going to be dedicated to that anyway.

“The first and most important step is to reduce the reliance on Eskom. If we bring down the costs, we can reduce the security risk on energy,” Holland said.

South Deep now expects the long-awaited official approval for the solar power project to go into the first quarter of next year. At night the operation will default back to the national electricity grid.

“All the indications are that it’s in process. You’ve heard that government and our sector Minister, in particular, are putting their full support behind it. The country needs it, so I’m hoping we’ll have the approval soon and we can give you the good news.

“There’s no reason why we shouldn’t get the approval. It’s just a process we’re working through,” Holland emphasised.

Approval, which must be granted by the National Energy Regulator of South Africa, was earlier expected before year-end.

The Johannesburg- and New York-listed Gold Fields first applied for permission to build the solar plant three years ago, during which time it succeeded in building and commissioning the 23 MW renewables plant at its Agnew gold mine, in Australia, where it is continuing to look into solar renewable power with battery enablers for other operations.

The group is able to learn from its $150-million blueprint microgrid experience at Agnew and implement that further at its other mines.

Of Salares Norte, the new mine Gold Fields is building in Chile, Holland says: “We’re going to be looking at a renewable component as well, as the technology changes, as the battery storage improves, and that’s not a billion light years away.”

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Latest News

Magazine video image
Magazine round up | 29 March 2024
29th March 2024

Showroom

Aqs image
AQS Liquid Transfer

AxFlow AQS Liquid Transfer (Pty) Ltd is an Importer and Distributor of Pumps in Southern Africa

VISIT SHOWROOM 
Flameblock
Flameblock

FlameBlock is a proudly South African company that engineers, manufactures and supplies fire intumescent and retardant products to the fire...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Hyphen, Eva mine, ferrochrome price make headlines
Hyphen, Eva mine, ferrochrome price make headlines
27th March 2024
Resources Watch
Resources Watch
27th March 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.124 0.164s - 91pq - 2rq
Subscribe Now