https://www.miningweekly.com

Scotland mine to pour first gold by end of November

4th September 2020

By: Mariaan Webb

Creamer Media Contract Publishing Editor

     

Font size: - +

The Cononish gold and silver mine, in Scotland, will pour its first gold by November 30, London-listed Scotgold reported on Friday.

In an update, the company reported that underground development activities and the critical path plant construction activities at Cononish had progressed well, while, at the same time, the Covid-19 safety protocols had been fully implemented.

Construction and development activities at Cononish were suspended between March 27 and June 15, owing to the coronavirus pandemic.

Located in the Highlands north of Glasgow, Cononish is Scotland’s first commercial gold mine. The project has faced several delays, with first production having been pushed out several times.

Cononish currently has estimated reserves of 550 000 t at a grade of 11.8 g/t gold which, at an average production rate of 23 370 oz/y, equates to a nine-year life-of-mine. The company said that there is the potential to increase this in the future. 

With this in mind, Scotgold announced an expanded geoscience team.

The first of these is the appointment of Dr Simon Dominy as group manager - resources and reserves. Simon is a mining geologist-engineer with over 25 years of practical and management experience in project development.

Secondly, David Catterall has been appointed as exploration consultant to advise on the Grampian project, which is focused on identifying gold and base metal mineralisation within the highly prospective Grampian Terrane.

"The depth of our geological understanding of both Cononish and the Dalradian belt is obviously key to our long-term success and with the appointments made today, we are building a world class geoscience team to unlock the fantastic potential of this whole area and our significant land holdings in particular,” said CEO Richard Gray.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Lilak Aluminium
Lilak Aluminium

For over 15 years, Lilak Aluminium, a trusted leader in architectural extrusion supply, has delivered excellence to businesses like yours.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.049 0.076s - 111pq - 2rq
Subscribe Now