Reno Creek in situ recovery uranium project, Wyoming, US
Name and Location
Reno Creek in situ recovery uranium project, Wyoming, US.
Client
Bayswater Uranium Corporation and Pacific Road Resources Fund.
Project Description
The Reno Creek project is located in the Powder River basin of Wyoming and is estimated to contain measured and indicated resources of 20.9-million tons at an average grade of 0.052% uranium oxide (U3O8), containing 21.9-million pounds of U3O8. The project’s inferred resource is an estimated 1.6-million tons at an average grade of 0,050% U3O8, containing1.6-million pounds of U3O8.
The project is designed to produce about 1.5-million pounds a year of U3O8 from 18 production units and a central processing plant (CPP).
Value
Initial capital costs are estimated at $75.6-million and includes the CPP facility and the first production unit at Reno Creek, which consists of six wellfield/header houses an estimated 480 production wells and 40 monitor wells.
Duration
A timeframe has not been disclosed.
Latest Developments
None stated.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Not stated.
Contact Details for Project Information
Bayswater Uranium Corporation, tel +1 604 687 2153 or fax +1 604 669 8336.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation















