Name of the Project
Ravenswood gold mine expansion project.

Location
Queensland, Australia.

Client
Resolute Mining.

Project Description
Ravenswood has total mineral resources of 172.41-million tonnes grading 0.8 g/t gold and proven and probable reserves of 69.66-million tonnes grading 0.8 g/t.

A feasibility study completed on the project has confirmed a long-life, low-risk and low-cost development plan with robust economics.

The mine’s life has been extended by 13 years, with operations expected to continue until at least 2029.

The study envisages average production to increase to an estimated 120 000 oz/y of gold.

The study was undertaken to maintain continuity of production at Ravenswood by transitioning operations back to openpit mining as the Mt Wright underground mine prepares for closure in 2017.

It defines Resolute’s plans to complete the Mt Wright underground mine and extend mining operations at Ravenswood by restarting openpit mining in the Nolans East, Sarsfield and Buck Reef West pits.

The plan comprises mining operations in three separate openpits, which include:
• Nolans East – a small pit is being developed at the eastern end of the present Nolans pit, which involves a cutback of the eastern and northern walls;
• Sarsfield – a cutback of the main Sarsfield openpit; and
• Buck Reef West – the excavation of a new openpit. The area has previously been the subject of small-scale underground and openpit mining.
The mining operations required for the development of the openpits comprise two separate components:
• Dredging of tailings from the Sarsfield pit; and
• Conventional drill-and-blast and load-and-haul operations at Nolans East, Sarsfield and Buck Reef West.

Jobs to be Created
The expansion project is expected to create an estimated 280 permanent jobs and lead to a significant number of jobs being created in the Ravenswood region.

Net Present Value/Internal Rate of Return
Not stated.

Value
The project requires start-up capital of A$134-million for prestripping and staged processing plant expansion to five-million tonnes a year.

Duration
The feasibility study envisages:
• Mt Wright underground operations continuing until eventual closure in mid-2017;
• first ore from Nolans East being processed from September 2016;
• an increase in processing capacity to 2.8-million tonnes a year from October 2016;
• approval for mining the Sarsfield openpit in January 2017 and the Buck Reef West openpit in mid-2018; and
• the expansion of mill capacity to five-million tonnes to start in the 2018 financial year.

Latest Developments
The Queensland Department of Environment and Heritage Protection has issued a draft amended Environmental Authority (EA) that could enable gold miner Resolute Mining to restart mining operations at its Sarsfield openpit mine.

The amended EA is an important milestone in the government approval process for the planned Ravenswood expansion project.

Resolute Mining MD and CEO John Welborn has said that restarting mining activities at the Sarsfield pit is a critically important aspect of the company’s plans to expand production and extend the mine life at Ravenswood.

The draft amended EA includes all provisions necessary for openpit mining to restart at Sarsfield, and the final approval is expected in March, provided there are no delays in the review process.

The receipt of the draft amended EA follows the grant of prescribed project status by the state government in December, which is expected to significantly streamline administrative decisions and ensure that essential project regulatory approvals are received on a timely basis.

Resolute has said that it will now start the formal approval process for the Buck Reef West project, with environmental approvals expected by mid-2018.

The Mt Wright underground operations are expected to continue until its eventual closure later this year, with openpit mining at Nolans East restarting and continuing during the year.

Processing capacity during this time will increase to 2.8-million tonnes a year.

Following the regulatory approvals of the Sarsfield and Buck Reef West operations, Resolute is hoping to expand the mill capacity to five-million tonnes a year during 2018.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
Not stated.

Contact Details for Project Information
Resolute Mining, tel +61 8 9261 6100, fax +61 8 9322 7597 or email contact@rml.com.au.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Alcohol Breathalysers
Alcohol Breathalysers

Supplier & Distributor of the Widest Range of Accurate & Easy-to-Use Alcohol Breathalysers

VISIT SHOWROOM 
Alco-Safe
Alco-Safe

Developed to exceed the latest EN 15964 standards for police breathalysers proving that it will remain accurate and reliable for many years to come.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.047 0.707s - 111pq - 2rq
Subscribe Now