Pöyry awarded engineering services assignment for expansion of Lausanne railway station, Switzerland
This article has been supplied.
Pöyry awarded engineering services assignment for expansion of Lausanne railway station, Switzerland
Swiss Federal Railways has appointed Pöyry, as part of the engineering consortium 4G, for the "Galette - Bâtiment Voyageur" (passenger building) main lot at Lausanne station. Pöyry is deploying expertise from across departments including civil engineering, railway engineering and buildings divisions to help implement the large scale project.
To cater for increasing passenger numbers on the route between Lausanne and Geneva, the railway stations in Lausanne, Geneva and Renens will be completely renovated. In Lausanne, the new expanded station will be completed in 2025.
The main lot of this large scale project covers the entire current railway station. The central components are the widening and extension of the platform, expansion of the underpasses and shopping floor below them, the tunnel beneath the historic station building and reconstruction of the building at the southern end of the station. Pöyry will play a crucial role as part of the engineering consortium 4G in the construction project, its tendering and execution. The planning work starts in September 2016, execution is from 2018 and commissioning is envisaged for 2025.
"Pöyry's experience in the project planning and implementation of the Löwenstrasse station in Zurich, in which we played a leading role, will benefit this project. We are pleased to bring in our cross-disciplinary expertise and contribute to the success of this complex major inner-city project," says Martin Bachmann, manager of Pöyry's Buildings Division in Switzerland.
The Galette - Bâtiment Voyageur lot is a particularly demanding mandate, involving the carrying out of a highly complex construction project during normal operations. The planned shifting of the historic protected hall roof, which must be retained and lifted, will be particularly challenging for the engineers. Building Information Modelling (BIM) will be used as part of the project. Thanks to BIM - still a relatively new procedure in Switzerland - the coordination effort between the owners and the companies involved can be significantly reduced.
The value of the order is not disclosed. The order has been recognised within the Regional Operations Business Group order stock in Q3/2016.
Article Enquiry
Email Article
Save Article
Feedback
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation















