https://www.miningweekly.com

Pickstone-Peerless gold project, Zimbabwe

30th August 2013

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

  

Font size: - +

Name and Location
Pickstone-Peerless gold project, Zimbabwe.

Client
African Consolidated Resources (AFCR).

Project Description
The definitive feasibility study (DFS) completed on the oxide cap (Phase 1) of the project – a subset of the entire Pickstone-Peerless mine project – has allowed AFCR to declare a maiden reserve of 2.02-million tonnes, grading 2.06 g/t gold for 136 052 oz, based on a gold price of $1 500/oz and a cutoff grade of 0.4 g/t.

Value
Phase 1 is estimated at $23.54-million.

Duration
The implementation of Phase 1 is expected in June 2014.

Latest Developments
Phase 2 is being considered at a prefeasibility level of study, the completion of which is expected in September or October, together with a conceptual study of underground mining, which will represent Phase 3.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
Not stated.

Contact Details for Project Information
AFCR, tel +44 1622 813 442.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Hanna Instruments (Pty) Ltd
Hanna Instruments (Pty) Ltd

We supply customers with practical affordable solutions for their testing needs. Our products include benchtop, portable, in-line process control...

VISIT SHOWROOM 
Iritron
Iritron

Iritron delivers advanced automation, control, and optimisation solutions to the Mining, Minerals & Metals, Consumer Package Goods and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.044 0.604s - 111pq - 2rq
Subscribe Now